Update
Gracie and Owen in their winter coats Stairway with with walls Back of house with finished siding Covered porch Front of house This will be brief...We were supposed to be to the point of painting this past weekend, but the drywall did not dry as quickly as they had hoped. So hopefully we will start painting this week. The gas has been hooked up, so we have a heated house as of last Wednesday. The cabinetry is supposed to be delivered this week and they will install as soon as we paint. The trim boards should also be delivered this week sometime, as well as our garage door. After that, not much is left but the flooring and plumbing/electrical fixtures. We also still need to have water hooked up. Other things are cement for the driveway and sidewalk and gravel for the drive. Gracie was sick over the weekend and I'm taking her to the doctor this afternoon, but of course she is doing fine today, so the trip will probably be worthless. I took her to the ISU football game on Satu...